Create a first project in KairoProject
A short tutorial to understand the basic logic of setting up a project.
2026-05-09 · updated 2026-05-09
A tutorial focused on understanding
The first tutorial should show the product logic, not just tick through a sequence of clicks.
- 1Create the project
- 2Set a steering horizon
- 3Capture the first useful constraints